|
|
盾构直接切削大直径桩施工技术研究 |
林向阳1,2 高伟琪3 刘学彦4 赵洪生1,2 郑德文1,2 |
1. 北京市政建设集团有限公司,北京100045
2. 北京市市政第四建设工程有限责任公司,北京100045
3. 中国矿业大学(北京),北京100083
4. 北京林业大学,北京 100083 |
|
Research on the construction technology of directly cutting large diameter piles with shield tunneling |
Lin xiangyang1 Gao weiqi3 Liu xueyan4 Zhao hongsheng1,2 Zheng dewen1,2 |
1. Beijing Municipal Construction Group Co., Ltd, Beijing 100045, China
2. Beijing Municipal Construction Engineering Co., Ltd, Beijing 100045, China
3. China University of Mining and Technology (Beijing), Beijing 100083, China
4. Beijing Forestry University, Beijing 100083,China |
|