| 
					
						|  |  
    					|  |  
    					| TBM隧洞软弱围岩不良地质段卡机机理及脱困技术:以我国西北某供水隧洞为例 |  
						| 张宝瑾1 谭忠盛1 李林峰1 裴成元2,3 |  
					| 1. 北京交通大学 城市地下工程教育部重点实验室,北京 100044 2. 新疆水发建设集团有限公司,新疆 乌鲁木齐 830000
 3. 新疆水利发展投资(集团)有限公司,新疆,乌鲁木齐 830000
 |  
						|  |  
    					| The jamming mechanism and release techniques of TBM tunneling in weak surrounding rock sections: a case study of a water supply tunnel in northwest China |  
						| Zhang Baojin1 Tan zhongsheng1 Li Linfeng1 Pei chengyuan2,3 |  
						| 1. Key Laboratory for Urban Underground Engineering of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China 2. Xinjiang Shuifa Construction Group Co., Ltd., Urumqi 830000 , China
 3. Xinjiang water Resources Development Inverstment (Group) Co., Ltd., Urumgi 830000, China
 |  
					
						| 
								
									| 
											
                        					
												
												
												
													
														
															| 
																																																																																																										
																					| [1] | 李庆楼 李元卓 裴成元. 冲沟断层破碎带TBM隧洞地表预注浆加固效果研究[J]. 土木工程学报, 2024, 57(S1): 52-58. |  
																					| [2] | 万泽恩 李树忱 赵一民 王曼灵 赵世森 周松. 富水地层盾构隧道同步注浆惰性充填材料配比与试验研究[J]. 土木工程学报, 2021, 54(7): 123-132. |  
																					| [3] | 王林 韩凯航 郭彩霞 解廷伟 骆建军. 盾构隧道穿越断层破碎带开挖面稳定性研究[J]. 土木工程学报, 2020, 53(S1): 93-98. |  
																					| [4] | 王秀英  郑维翰  张建国  刘卫. 软岩隧道玻纤锚杆预加固掌子面的稳定性分析[J]. 土木工程学报, 2017, 50(S1): 53-58. |  
																					| [5] | 徐前卫  丁文其  朱合华  唐卓华  李元海. 超大断面隧道软弱围岩卸荷渐进破坏特性研究[J]. 土木工程学报, 2017, 50(1): 104-114. |  |  
											 
											 |  |  |